首页> 外文会议>Technical Association of the Pulp and Paper Industry international bioenergy and bioproducts conference >New Control System Eliminates Plugging and Reduces Natural Gas Usage in the #22 Recovery Furnace at Longview Fibre Co.
【24h】

New Control System Eliminates Plugging and Reduces Natural Gas Usage in the #22 Recovery Furnace at Longview Fibre Co.

机译:新的控制系统消除了Longview Fiber Co.的#22回收炉中的堵塞并降低了天然气使用

获取原文

摘要

The #22 recovery furnace at Longview Fibre Co. was upgraded with a new model predictive control (MPC) package called MACS (Multivariable Advanced Control System) from Capstone Technology, Inc. The controller has reduced natural gas use for SO2 control in this furnace and has helped eliminate plugging in the upper furnace. The controller is described and data is presented to show the benefits of its operation.
机译:Longview Fiber Co.的#22恢复炉用Capstone Technology,Inc.的新型模型预测控制(MPC)封装升级为MACS(MPC)封装,CAPSTECION TECHNOLOGE,CONTRORCLES降低了该炉中SO2控制的天然气用途帮助消除了上炉中的堵塞。描述了控制器,并提出了数据以显示其操作的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号