'Full Span Precast and Launching Construction in Taiwan's High Speed Rail Project'

机译:“台湾高铁项目全跨预制和发射施工”

获取原文

摘要

Taiwan's North to South High Speed Rail project, with total cost of US$15 Billion and design speed of 350km/hour, includes 251km of elevated bridge structure within its total length of 345~(km). Among the bridge structures, 73% utilize full span precast and launching concrete construction techniques to achieve speedy, shortened construction periods and better quality control. It adopted the design-build delivery method to achieve single responsibility for construction in this private participated Build and Operate then Transfer to government program. The paper will briefly explain full span precast box girder of 30 to 35 meter weighing 750 to 840 ton and launching construction with several different types of launching equipment, precasting of the box girder process, storage yard quality control and launching techniques. The plant produced a 2 day cycle for each girder and reached 48 girders per month and a placement rate of 0.7 day per span installed. The design-build methods of assuring design quality and the independent checking process will be discussed. Taiwan High Speed Rail bridge structures' design criteria will be outlined in the presentation.
机译:台湾北南方高速铁路项目,总成本为150亿美元,设计速度为350公里/小时,包括251公里的桥梁结构,总长度为345〜(km)。在桥梁结构中,73%利用全跨预制和发射混凝土施工技术,实现迅速,缩短的施工期和更好的质量控制。它采用了设计 - 建设的交付方式,为此私营参与的建设进行了单一责任,并经营转移到政府计划。本文将简要介绍全跨预制箱梁30至35米的重量750至840吨,发射施工几种不同类型的发射设备,箱梁的预制梁工艺,储存码质量控制和发射技术。该植物为每个梁产生了2天的循环,每月达到48个梁,安装了0.7天的放置率。将讨论确保设计质量和独立检查过程的设计 - 构建方法。台湾高速轨桥结构的设计标准将在演示中概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号