首页> 外文会议>SPE International Symposium and Exhibition on Formation Damage Control >A Smart Approach in Acid Stimulation Resulted in Successful Reviving of Horizontal Producers Equipped With ICD Completions: Saudi Arabia Case History
【24h】

A Smart Approach in Acid Stimulation Resulted in Successful Reviving of Horizontal Producers Equipped With ICD Completions: Saudi Arabia Case History

机译:酸刺激的智能方法导致成功恢复配备ICD完成的水平生产商:沙特阿拉伯案例历史

获取原文
获取外文期刊封面目录资料

摘要

Passive completions, comprised of inflow control devices and external packers, are usually considered in horizontal wells, located in risky or mature areas. These completions are proven techniques for reservoir conformance to mitigate water or gas-coning problems and ensure uniform production contributions along the horizontal section. After well completion or shortly after initial production, these wells may fail to sustain production, largely due to formation damage or plugging in the inflow control devices. The conventional acid program, applied on wells with non-passive completions, is not suitable on these wells, due to the risk of impacting the completion integrity to the extent that it will violate the installation purposes. The requirements of acid treating wells with the same completions become inevitable due to the increasing number of wells equipped with these completions in a major carbonate reservoir in Saudi Arabia. A smart approach has been developed through innovative thinking to stimulate wells equipped with passive completions. The new approach has successfully stimulated four wells and resulted in restoring well productivity. This smart stimulation approach demonstrates a competent method to clean out the ICD completion along the horizontal section and to remove formation damage. This paper presents in depth discussion of rigless acid stimulation operations on oil producers to remove formation damage and improve well productivity, at a reduced cost. This paper also outlines the successful application of the smart approach in acid stimulation of horizontal wells — equipped with passive completion — and discussed the post-treatment results.
机译:由流入控制装置和外部包装机组成的被动完井通常在横向井中考虑,位于风险或成熟区域。这些完井是储层一致性的技术,以减轻水或气体波纹问题,并确保沿水平部分的均匀生产贡献。完成后或初始生产后不久,这些井可能无法维持生产,主要原因是由于形成损坏或堵塞流入控制装置。由于影响完成完整性的风险,在具有非被动完整的井上施加在具有非被动完整的井上的常规酸程序并不适用于它将违反安装目的的范围。由于在沙特阿拉伯的主要碳酸盐储层中的井数量越来越多的井数量,酸处理井的要求是不可避免的。通过创新思考来刺激配备被动完成的井的智能方法。新方法已成功刺激四个井,导致恢复良好的生产力。这种智能刺激方法演示了一种能够清理沿水平部分的ICD完成并删除形成损坏的能力方法。本文深入讨论石油生产商对石油生产者的无酸刺激操作,以降低成本降低形成损坏并提高生产率良好的生产率。本文还概述了智能方法在水平井的酸刺激中的成功应用 - 配备了被动完成 - 并讨论了后治疗结果。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号