Bearing Capacity Assessment and Maintenance Scheme Optimization on a 220kV Transmission Tower with Foundation Settlement

机译:220kV传输塔与基础结算的承载能力评估与维护方案优化

获取原文

摘要

Finite element model of a 220kV transmission tower was established in general software ANSYS. The constrained method of the freedoms of tower foots with foundation settlements was proposed. According to the monitoring data of the non-uniform settlement, the relative settlement values were applied at the tower foots as displacement loads. By considering the relative position relationship between the winirection and the settlement direction, the foundation settlement case can be combined with the design wind load case and the design ice load case, and structural analysis of the transmission tower totally includes 32 cases. The stresses of the main members and diagonal members at the tower head and tower body were calculated and assessed for different load cases. Optimization on the angle between staying wire and the ground was carried out. The reducing efficiency of stresses by using staying wires for two angles between the staying wires and the ground was compared.
机译:一般软件ANSYS建立了220kV传输塔的有限元模型。提出了基础沉降塔脚自由的约束方法。根据不均匀沉降的监测数据,相对沉降值在塔脚下施加,作为位移载荷。通过考虑悬挂和沉降方向之间的相对位置关系,基础沉降壳体可以与设计风力载荷箱和设计冰负荷壳体相结合,并且传输塔的结构分析完全包括32例。计算和评估主要成员和塔主体处的塔头和塔体处的对角线构件的应力。进行了保持线与地面之间的优化。比较了通过在停留线和地面之间使用停留线来降低应力效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号