首页> 外文会议>International Conference on Multimedia Technology >Two Different Machine Assignment Methods for Steelmaking and Continuous Casting
【24h】

Two Different Machine Assignment Methods for Steelmaking and Continuous Casting

机译:两种不同的机械分配方法,用于炼钢和连续铸造

获取原文
获取外文期刊封面目录资料

摘要

Scheduling difficulties and parallel machine alternative characteristics are centred upon machine assignment problems in steelmaking and continuous casting (SCC) scheduling process. Two different machine assignment methods: dynamic programming and rule-based, are proposed so as to select the better machines for furnace charges. The mathematical models of machine assignment are built up based on the two methods, two rough schedules are formed by solving above two models. Two feasible schedules are produced by using the same conflict elimination mathematical model for machines conflict possible in the rough schedules, and comprehensive evaluation index are established. The both methods are simulated using actual production data from a large steel plant. The two experimental results are evaluated by comprehensive evaluation index. The applicable condition and disadvantages of the both methods are gave through comparing to the simulation results. Powerful support is provided to select rational machine assignment methods for further application in engineering.
机译:调度困难和并联机器替代特征是炼钢和连铸(SCC)调度过程中的机器分配问题。两种不同的机器分配方法:提出了动态编程和规则,以便选择更好的炉充电机器。基于两种方法建立了机器分配的数学模型,通过求解两个模型来形成两个粗略的时间表。通过使用相同的冲突消除机器冲突的数学模型产生了两个可行的时间表,可以在粗略的时间表中冲突,并建立综合评估指标。两种方法都是使用来自大型钢铁厂的实际生产数据进行模拟。通过综合评估指标评估两种实验结果。通过与仿真结果相比,两种方法的适用条件和缺点是给出的。提供强大的支持,以选择Rational Machine分配方法,以便在工程中进一步应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号