首页> 外文会议>Water quality technology conference exposition >Out of the Frying Pan and Into Disinfection Byproducts: Simultaneous Compliance Issues Encountered During Arsenic Removal
【24h】

Out of the Frying Pan and Into Disinfection Byproducts: Simultaneous Compliance Issues Encountered During Arsenic Removal

机译:在煎锅中进入消毒副产品:砷删除期间遇到的同时符合要求问题

获取原文

摘要

Developing cost-effective strategies for arsenic removal is an ongoing challenge for many utilities, particularly small systems. From 2002 to 2011 the US EPA sponsored the Arsenic Removal Demonstration Program to provide field-scale data on practicable technologies including absorptive media, coagulation/filtration and ion exchange. Supplemental studies were conducted to determine how the addition of the arsenic removal technology might affect compliance with disinfection byproduct (DBP) requirements, particularly since some of the technologies required pre-oxidation to convert arsenic(Ⅲ) to arsenic(Ⅴ). Another challenge is that many small systems operate on-demand which can lead to wide variations in oxidant contact times. A case study of relationships between arsenic removal and DBP formation in one treatment system is presented in this paper. Results of bench-scale and in-plant testing are presented. Guidance is provided for screening of technologies to ensure that simultaneous compliance can be achieved in conjunction with treatment facility upgrades.
机译:开发砷拆除的成本效益战略是许多公用事业,特别是小系统的持续挑战。从2002年到2011年,美国EPA赞助了砷拆卸示范计划,以便在可行性技术上提供现场规模数据,包括吸​​收介质,凝血/过滤和离子交换。进行补充研究以确定加入砷去除技术的增加可能影响副产品(DBP)要求的遵守情况,特别是由于一些所需的一些技术来预氧化以将砷(Ⅲ)转化为砷(Ⅳ)。另一个挑战是许多小型系统可按照需求运行,这可能导致氧化剂接触时间的宽变化。本文介绍了一种处理系统中砷去除和DBP形成之间的关系的案例研究。提出了长凳和工厂测试的结果。提供了用于筛选技术的指导,以确保可以与治疗设施升级结合同时遵守。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号