Because of the growing demand in the Bolivian market for cement, SOBOCE made the decision to perform the implementation of a closed circuit Roller Press (RP) inside the closed circuit of an existing Ball mill (BM) in order to double the total production capacity of the entire system. The existing ball mill control system was based in Hard-wired logic, but the new RP control system required a PLC logic system. Taking advantage of this project, due to the need to have a new Control system based on PLC technology for the new RP system, a requirement was born to upgrade all the hard wired logical system of the existing BM and implement a new control platform for the new RP system and for the existing BM (MCC, MV starter, etc) plus the existing and new instrumentation for the entire system. Also change the existing three Weight feeders of raw material for new ones. Everything considering: that the new control system platform and the hardware structure will be the future platform for all the other departments in Plant such as the kiln. The maximum shutdown time allowed performing all the mentioned changes and the interconnection between systems was 5 days.
机译:由于玻利维亚水泥市场需求不断增长,Soboce使得决定在现有球磨机(BM)的闭合电路内进行闭路辊压(RP)的实施,以便增加总生产能力整个系统。现有的球磨机控制系统基于硬连线逻辑,但新的RP控制系统需要PLC逻辑系统。利用该项目,由于需要具有基于PLC技术的新RP系统的新控制系统,要求升级现有BM的所有硬连线逻辑系统,并为此实施新的控制平台新的RP系统和现有的BM(MCC,MV启动器等)加上整个系统的现有和新仪器。还可以改变新的三种原料的原料的三重喂料器。一切考虑:新的控制系统平台和硬件结构将是窑等所有其他部门的未来平台。允许的最大关断时间执行所有提到的更改和系统之间的互连为5天。

著录项

  • 来源
    《IEEE ANDESCON》|2014年||共1页
  • 会议地点
  • 作者

    von Borries Erick;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TP3-53;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号