COORDINATION OF THE COMMISSIONING OF THE LHC TECHNICAL SYSTEMS

机译:协调LHC技术系统的调试

获取原文

摘要

The Large Hadron Collider operation relies on 1232 superconducting dipoles with a field of 8.33T and 400 superconducting quadrupoles with a strength of 220 T/m powered at 12kA, operating in superfluid He at 1.9K. For dipoles and quadrupoles as well as for many other magnets more than 1700 power converters are necessary to feed the superconducting circuits. A sophisticated magnet protection system is crucial to detect a quench and safely extract the energy stored in the circuits (about 1GJ only in one of the dipole circuits) after a resistive transition. Besides, in such complex architecture, many technical services (e.g. cooling and ventilation, technical network, electrical distribution, GSM network, controls system, etc.) have to be reliably available during commissioning. Consequently, the commissioning of the technical systems and the associated infrastructures has been carefully studied. Procedures, automatic control and analysis tools, repositories for test data, management structures for carrying out and following up the tests have been put in place. This paper briefly describes the management structure and the tools created to ensure safe, smooth and rapid commissioning.
机译:大型强子碰撞器操作依赖于1232个超导偶极孔,具有8.33T和400个超导四轮节,其强度为12kA的强度,在12KA下,在1.9K处运行。对于偶极子和四元级以及许多其他磁铁,需要超过1700个功率转换器来馈送超导电路。在电阻转换之后,复杂的磁体保护系统对于检测淬火并安全地提取存储在电路中的能量(仅在一个偶极电路中的一个偶极电路中的大约1GJ)的情况至关重要。此外,在这种复杂的体系结构中,许多技术服务(例如,冷却和通风,技术网络,电气分配,GSM网络,控制系统等)必须在调试期间可靠地使用。因此,仔细研究了技术系统和相关基础设施的调试。程序,自动控制和分析工具,测试数据的储存库,进行管理结构以及跟踪测试的管理结构已经到位。本文简要介绍了管理结构和创建的工具,以确保安全,平滑和快速调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号