首页> 外文会议>Biennial European Particle Accelerator Conference >DEVELOPMENT OF IVUN AT POHANG ACCELERATOR LABORATORY
【24h】

DEVELOPMENT OF IVUN AT POHANG ACCELERATOR LABORATORY

机译:浦村在浦项加速器实验室的发展

获取原文

摘要

Pohang Accelerator Laboratory (PAL) is developing In Vacuum Undulator (IVU). With operating experience of in vacuum revolver undulator from SPring8 and conventional IVU from ADC, the first IVU with 22.3 mm magnetic period will be developed which has 1.8 m magnetic length and 2.2 m flange to flange length which will be installed in the PLS storage ring. The IVU will be equipped with online built-in magnetic measurement for the end regions to assess the accuracy of the assembly, any degradation coming from the radiation damage or high temperature. In this report, the design issues related to the vacuum system, measurement system, and other engineering problems of the IVU will be discussed.
机译:Pohang Accelerator实验室(PAL)在真空波动器(IVU)中发展。利用来自Spring8的真空旋转器波浪器的操作经验以及来自ADC的常规IVU,将开发出具有22.3毫米磁时段的第一IVU,其磁长为1.8米和2.2米法兰到法兰长度,该法兰长度将安装在PLS存储环中。 IVU将配备在线内置磁测量的端部区域,以评估组件的准确性,任何来自辐射损坏或高温的降解。在本报告中,将讨论与真空系统,测量系统和IVU的其他工程问题相关的设计问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号