首页> 外文会议>Biennial European Particle Accelerator Conference >ACHIEVEMENT AND EVALUATION OF THE BEAM VACUUM PERFORMANCE OF THE LHC LONG STRAIGHT SECTIONS
【24h】

ACHIEVEMENT AND EVALUATION OF THE BEAM VACUUM PERFORMANCE OF THE LHC LONG STRAIGHT SECTIONS

机译:LHC长直截面梁真空性能的成就与评价

获取原文

摘要

The bake-out and activation of the TiZrV NEG coatings of the 6 km Long Straight Sections (LSS) of the Large Hadron Collider (LHC) is in its final step. After the bakeout and the NEG activation, the average ultimate pressure, over more than one hundred vacuum sectors, is below 10~(-10) Pa. Therefore, the nominal requirement for the four experimental insertions is fulfilled. The nominal performances are also ensured for all the insertions housing the collimator systems, the RF cavities and the beam dumping systems. The main difficulties encountered during the bake-out and the activation of the NEG coated chambers is presented and discussed. In particular, the acceptance test and the limiting factors of the reached ultimate pressures are addressed. Furthermore, the influence on the ultimate pressures of the beam components (collimators, beam instrumentation, etc.) is discussed. Finally, preliminary results obtained from a NEG vacuum pilot sector installed in the laboratory and dedicated to the evaluation of the NEG performance is presented.
机译:6公里长的RoRON撞机(LHC)的6公里长的截面(LSS)的TizRV Neg涂层的烘烤和激活是最终步骤。在烘烤和NEN激活之后,平均最终压力超过一百个真空扇区,低于10〜( - 10)PA。因此,满足了四种实验插入的标称要求。还可以确保所有插入的标称性能,所述插入准直器系统,RF腔和光束倾卸系统。展示和讨论了在烘烤期间遇到的主要困难和烘焙盒的激活。特别是,接受测试和达到的最终压力的限制因素得到解决。此外,讨论了对梁部件(准直器,光束仪表等)的最终压力的影响。最后,提出了在实验室安装并致力于评估“否定表现”的初步结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号