The cowper is an key tool in process line for steel production. In case of an unforeseen problem the complete process line will be stooped. Therefore a pre-warning against failures is important and pre-warning methodologies have to be evaluated. It is obvious, that AT and much more AE monitoring are excellent for this purpose, especially if all necessary preparations are done properly. According AE standardisation (EN 13455 "General information") the pre-information's have to be evaluated on-time and must influence the design and later on also production of the cowpers. During the design stage one of the most critical part is the selection of the "right" sensors, their application methodology and especially also their position. One of the first steps of measurement is to gather the information about the acoustic behaviour of the material and the cowpers at all. The complete test was performed according EN 14584 with Δ-t location. During the acceptance tests the maximum pressure were applied twice, because on one hand the residual stress from the welding process shall be eliminated but much more on the other hand the influence of the inside insulation have to be taken into account. This insulation may be also one of the most critical parts during the life-time of the cowper. Both pressure tests were monitored with AE and the acquired data were evaluated according known and pre-defined evaluation criteria. The aim of these tests was to proof the quality of the production but also give the AE a basic signature of the acoustic behaviour of all sources, which were detected in the structure. The tests gave also an opportunity to improve and verify the evaluation and rejection criteria. The influence of all detected source has to be considered according their present and future influence of the different stages of the service life. The results of the basic pressure test of a new cowper will used for a comparisons for the later AT and planed discontinuous and/or continuous AE monitoring as a pre-warning tool against a failure and for on-time detection of possible defects. The presented works will be checked against the on-going works for the standardisation of AE monitoring of metallic pressure equipment's in the sense of pre-warning methodology against failure and for detection of imperfections (defects).
机译:Cowper是钢铁生产线的一个关键工具。如果发生不可预见的问题,将弯下完整的过程线。因此,防止故障预警是重要的,并且必须评估预警方法。显而易见的是,在此目的的情况下,在此目的的情况下,特别是如果所有必要的准备都是正确完成的。根据AE标准化(EN 13455“一般信息”)必须准时评估前信息,并且必须影响设计和后来的整流罩的生产。在设计阶段期间,最关键的部分之一是选择“右”传感器,其应用方法,特别是它们的位置。第一步的一个测量步骤之一是收集有关材料的声学行为的信息和总体的信息。根据Δ-T位置,根据EN 14584进行完整测试。在验收测试期间,最大压力施加两次,因为一方面应淘汰焊接过程的残余应力,但另一方面,必须考虑内部绝缘的影响。该绝缘层也可以是流行者寿命期间最关键的部分之一。用AE监测两个压力测试,并根据已知的和预定义的评估标准进行评估所获得的数据。这些测试的目的是证明生产的质量,而且还给AE为所有来源的声学行为的基本签名,这些来源在结构中检测到。测试还给出了改进和验证评估和拒绝标准的机会。所有检测到的来源的影响都必须根据自己的使用寿命的不同阶段的目前和未来的影响。新电台的基本压力测试的结果将用于稍后的和/或连续AE监测的比较,作为预警工具,防止失败,并且用于接通时间检测可能的缺陷。将对所提出的作品进行检查,以便在持续的作品中进行金属压力设备的标准化,以防止预警方法的预警方法和检测缺陷(缺陷)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号