【24h】

Flow rate optimization for hydropower plants

机译:水电站流量优化

获取原文

摘要

This paper describes an algorithm for the flow rate optimization of hydropower plants. This algorithm has been implemented in the optimization system installed in Tombetta hydro power plant, in order to distribute the water flow rate between seven vertical Kaplan turbines maximizing the produced power. The new advanced flow control -"optimized"- has been added to the typical manual and automatic ones, by merging a mathematical approach (the optimization algorithm) and the physical response (plant delays, dynamics and hysteresis). This paper describes the process, its optimized control and the obtained results/benefits.
机译:本文介绍了一种用于水电站流量优化的算法。该算法已经在安装在墓草水电站的优化系统中,以分配七个垂直Kaplan涡轮机之间的水流速,最大化产生的功率。新的高级流量控制 - “优化” - 通过合并数学方法(优化算法)和物理响应(工厂延迟,动态和滞后)来添加到典型的手动和自动。本文介绍了该过程,其优化的控制和所获得的结果/福利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号