Mining in the 100/900 orebodies (OB) at Copper Cliff Mine in the Sudbury Basin has been associated with significant seismic activity. In September 2008, a 3.8 magnitude event occurred in the middle 100/900 OB and caused considerable damage to various excavations on multiple levels. Approximately 3,0001 of material were displaced in total and the damage was spread over a 300 m vertical block between 2700 and 3710 L An analysis of the rockburst incident revealed that the previously installed support system was inadequate to withstand the impact of the dynamic load caused by the 3.8 Nuttli magnitude (Mn) seismic event. In view of this, a decision was taken to identify the areas prone to bursting, so that a burst-resistant support system could be employed, which would help minimise damage in the case of future occurrences. Accordingly, a rating system was developed to identify the areas that are prone to bursting conditions and Vale employed burst-resistant support system in all such identified areas.
机译:在铜崖矿在萨德伯里盆地九百分之百矿体(OB)矿业已与显著地震活动有关。 2008年9月,一个3.8级的事件发生在中部九百分之百OB,并造成多层次的各种发掘相当大的损害。约材料的3,0001总共被移位并且损害是2700和岩爆事件的3710种的分析之间传播超过300米的垂直块显示,先前安装的支撑系统不足以承受动态负载而引起的冲击由3.8 Nuttli大小(Mn)的地震事件。鉴于此,作出了一项决定,以确定容易出现爆裂的区域,使抗突发支撑系统可以使用,这将有助于降低未来出现的情况下损坏。因此,一个评级系统被开发,以确定易于在所有这样的识别的区域破裂条件和Vale就业耐爆裂支持系统的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号