首页> 外文会议>International Seminar on Deep and High Stress Mining >Strategies for mining in highly burst-prone ground conditions at Vale Garson Mine
【24h】

Strategies for mining in highly burst-prone ground conditions at Vale Garson Mine

机译:Vale Garson Mine在高度突破易受地面条件下采矿的策略

获取原文

摘要

While mining at depth in #1 Shear East orebodyfrom 4700 Level to 5100 Level at Vale's Garson Mine in the Sudbury Basin, several major seismic events have occurred. The largest of these events recorded a magnitude of 3.1 Mn (Nuttli), resulting in substantial damage to underground openings on multiple levels. Described within this paper are the findings from an extensive review of those major seismic events focusing on the determination of source mechanisms. Both strategic and tactical mitigation measures to withstand future seismic impact are presented in the paper. Strategic measures include: developing an engineering geology model to identify all future high risk zones; undertaking numerical modelling to re-examine mining sequence; and investigating a mining layout change from transverse to longitudinal mining to gain a favourable stress environment. Tactical measures include: developing a methodology to determine the types of enhanced support required for high risk zones and standardising ground support practices when mining through various active dykes.
机译:在萨德伯里盆地的Vale在Vale的Garson Mine的4700级挖掘到5100级,挖掘#1剪切Eastbody的挖掘到5100级。这些事件中最大的幅度为3.1米(Nuttli),导致多个层面的地下开口造成大量损坏。本文中描述的是对重点审查重点介绍源机制的主要地震事件的调查结果。本文提出了耐受未来地震影响的战略和战术缓解措施。战略措施包括:制定工程地质模型,以确定所有未来的高风险区域;进行数值模型以重新检查挖掘序列;并调查从横向于纵向采矿的挖掘改变,以获得有利的应力环境。战术措施包括:开发一种方法,以确定高风险区域所需的增强支持的类型,以及在通过各种活性堤坝开采时的标准化地面支持实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号