首页> 外文会议>IASTED African Conference on Water Resource Management >LONG TERM SIMULATION OF GROUNDWATER SITUATION IN MURAUK BASIN DUE TO GREAT-MAN MADE PROJECT PUMPING IN LIBYA
【24h】

LONG TERM SIMULATION OF GROUNDWATER SITUATION IN MURAUK BASIN DUE TO GREAT-MAN MADE PROJECT PUMPING IN LIBYA

机译:利比亚的伟大项目泵浦穆劳盆地地下水局面的长期仿真

获取原文

摘要

Libya is considered as one of those countries which suffer from limited water resources availability. About 95% of the country is desert. The average annual rainfall is just between 10 mm to 500 mm over the entire Libyan land surface. The Great Man-Made River Project (GMMRP), started in 1984, transfers groundwater from the southern aquifers to the northern part at a rate of 5.7 million m~3/day over thousands of kilometers. Continuing water consumption from the aquifer system over the last two decades has resulted in significant lowering of the groundwater level and affecting its quality. This paper is focusing on the drawdown of groundwater level due to Great Man-Made Project pumping at Murzuk Basin. The study is carried out using Groundwater Vistas (GV) software, MODFLOW is the package that selected for water level simulation to get the steady-state condition at study area for long-term of pumping, and MODOFC to make an optimization model, it is formulated in term to minimizing the total water extract and water head as objective functions.
机译:利比亚被认为是患有有限的水资源可用性的国家之一。大约95%的国家是沙漠。整个利比亚地面,年平均降雨量在10毫米至500毫米之间。伟大的人造河工程(GMMRP)于1984年开始,将地下水从南部含水层转移到北部,以570万米〜3 /天超过数千公里。在过去二十年中,从含水层系统的持续耗水导致地下水位的显着降低,并影响其质量。本文采用Murzuk盆地的伟大人造项目泵送了地下水位的降低。该研究是使用地下水Vistas(GV)软件进行的,Modflow是选择用于水位模拟的包,以便在研究区域获得稳态条件,以便长期泵送,以及Modofc制作优化模型,是术语配制成最小化总水提取物和水头作为客观功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号