首页> 外文会议>International Conference on Uranium >REMEDIATION OF A URANIUM PROCESSING FACILITY
【24h】

REMEDIATION OF A URANIUM PROCESSING FACILITY

机译:修复铀加工设施

获取原文

摘要

Golder Associates Ltd. (Golder) provided overall radiological direction and assistance to the client in planning for the remediation of a Calciner Room which had once operated as the final stage of a uranium processing circuit. Afterwards, Golder provided operational radiation protection services during the remediation work. The project was somewhat unusual in that the contaminated steel from within the Calciner Room was recycled. In addition, the presence of concentrated uranium within the process equipment required stringent radiation protection measures beyond those normally employed for such remediation. This part of the project was completed successfully with worker radiation exposures well below the regulatory dose limits and with the effective protection of the environment.
机译:Golder Associates Ltd.(Golder)为客户提供了整体放射线方向和援助,规划了次煅烧炉房,该煅烧炉房曾经作为铀加工电路的最终阶段进行过。之后,Golder在修复工作期间提供了运营辐射保护服务。该项目有些不寻常的是,从煅烧炉室内被污染的钢回收。此外,在工艺设备内的浓缩铀的存在需要严格的辐射保护措施,超出通常用于此类修复的措施。该项目的这一部分成功完成了工人辐射曝光,远低于监管剂量限制,并有效保护环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号