首页> 外文会议>International Conference on Uranium >REMEDIATION OF WISMUT’S URANIUM TAILINGS PONDS AT SEELINGST腄T, GERMANY
【24h】

REMEDIATION OF WISMUT’S URANIUM TAILINGS PONDS AT SEELINGST腄T, GERMANY

机译:德国Seelingst的铀矿尾矿池塘的修复

获取原文
获取外文期刊封面目录资料

摘要

As part of its mine closure program Wismut GmbH is remediating the Uranium tailings ponds Culmitzsch and Trunzig covering 3.6 km2 pond area including approximately 104 million m3 tailings. From 1960 till 1990 tailings were discharged into tailings ponds erected in a densely populated area. Contaminant leakage from the tailings enters the surrounding aquifers and the receiving streams. Dry remediation in situ started with first securing measures in 1991 and will last till 2020. The paper presents the conception for the entire remediation of the tailings ponds, the actual remediation status achieved to date and an outlook to the future.
机译:作为其矿山封闭计划的一部分,Wismut GmbH正在修复铀尾矿池塘Culmitzsch和Trunzig覆盖3.6 km2池塘区域,包括大约1.64亿m3尾矿。从1960年到1990年,尾矿被排入尾矿池中,钻入密集地区。尾矿的污染物泄漏进入周围含水层和接收流。原位干燥纠正于1991年首次确保措施,将持续到2020年。本文介绍了尾矿池整个修复的概念,迄今为止达到的实际补救状况和对未来的前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号