首页> 外文会议>International Conference on Information Science and Engineering >Project Process Sequencing Based on Dependency Structure Matrix (DSM)
【24h】

Project Process Sequencing Based on Dependency Structure Matrix (DSM)

机译:基于依赖结构矩阵(DSM)的项目流程排序

获取原文

摘要

This paper points out that the selection of the optimization objective function for Dependency Structure Matrix (DSM) sequencing optimization should not only consider the number and distance of the feedbacks, but also should take into consideration activity's rework probabilities, costs and time. Furthermore, this paper proposes the activity's ratio of cost to time and Rework Factor matrix as the optimization parameters, and proposes Total Coordination Cost (TCC) as the optimization objective function. An improved Genetic Algorithms (GAs) is used to help optimize the project. The simulation result indicates that the feedbacks and the total project costs can be significantly reduced using TCC as optimization objective function comparing to traditional optimization methods.
机译:本文指出,为依赖结构矩阵(DSM)测序优化的优化目标函数的选择不仅应考虑反馈的数量和距离,还应考虑活动的返工概率,成本和时间。 此外,本文提出了作为优化参数的时间和返工因子矩阵的成本和返工因子矩阵的比率,并提出了总协调成本(TCC)作为优化目标函数。 改进的遗传算法(气体)用于帮助优化项目。 仿真结果表明,使用TCC可以显着降低反馈和总项目成本作为与传统优化方法相比的优化目标函数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号