首页> 外文会议>IFAC Conference on Cost Effective Automation in Networked Product Development and Manufacturing >FUNCTIONAL REQUIREMENTS AND DESIGN STEPS FOR A KEY METRIC SYSTEM TO PLAN RAMP-UP COSTS
【24h】

FUNCTIONAL REQUIREMENTS AND DESIGN STEPS FOR A KEY METRIC SYSTEM TO PLAN RAMP-UP COSTS

机译:一个关键公制系统的功能要求和设计步骤,用于规划增值费用

获取原文

摘要

The successful execution of ramp-ups is imperative for the financial performance of companies. In 2004, almost 60 per cent of all ramp-ups missed their economic targets. Currently, ramp-up costs are often insufficiently planned and controlled. This leads back to the fact that their drivers are opaque, and that methods and/or instruments supporting the planning and controlling of ramp-up costs are entirely missing. This contribution presents the requirements for a key metric system to improve the planning and control of ramp-up costs. Furthermore, we systematically demonstrate how this metric system can be built up by following a four step approach. Finally, also the benefits of using the key metric system are investigated.
机译:成功执行增值公司对公司的财务表现是必不可由的。 2004年,近60%的斜坡均错过了他们的经济目标。目前,增值费用通常不足,计划和控制。这导致他们的司机是不透明的,并且支持规划和控制增值费用的方法和/或仪器完全缺失。此贡献提出了一个关键公制系统的要求,以改善升降成本的规划和控制。此外,我们系统地演示了如何通过以下四个步骤方法构建该度量系统。最后,研究了使用关键公制系统的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号