Delayed Ettringite Formation (DEF) Within Pre-Cast Concrete Cladding Panels on a Mid-Rise Commercial Office Building: A Case Study

机译:在中层商业办公楼的浇铸预铸造混凝土覆层板中延迟Ettringite形成(DEF):一个案例研究

获取原文

摘要

This paper will present the findings of multiple forensic Investigations on a fourteen-story office building located in Houston, Texas. During our Initial survey, widespread cracking was observed within the concrete cladding panels that warranted a more extensive investigation. Construction of the building was completed in 1985; 17 years prior to our initial investigation. Exterior cladding components are comprised of pre-cast concrete panels over each of the floor lines, with a continuous, structurally glazed, horizontal window system at each floor level. The cladding panels are nonload bearing, pre-cast concrete panels, installed at the time of the building's construction. The concrete panels are attached to the structure via steel plates that are welded and bolted to the building's frame. It is intended that this paper will present the results of observations made at the site over a period of several years, as well as the results of testing conducted to assist in the evaluation. A system was developed to locate and catalog the visible anomalies on the panels; including cracks, exposed steel, spalls, pop-outs, and efflorescence on the panels. Full-depth cores were removed from select panels to perform a petrographic analysis and scanning electron microscopy/energy dispersive x-ray microanalysis (SEM/EDXA). The results revealed the presence of delayed ettringite formation (DEF) and alkali-silica reactivity (ASR), with varying degrees of severity. Specific conclusions will be derived related to the conditions at this project and how these anomalies have affected the cladding system performance. Current repair and maintenance provisions will be discussed, in addition to the necessary recladding that will be required in the future. Recommendations will be developed regarding construction practices so that the cladding panel failure observed may be avoided in the future.
机译:本文将展示位于德克萨斯州休斯顿的十四层办公楼的多种法医调查的调查结果。在我们的初步调查中,在保证更广泛的调查中的混凝土包层面板内观察到广泛的裂缝。建筑的建设于1985年完成;在我们的初次调查之前17年。外部包层组件由每个楼层线上的预浇铸混凝土板组成,每个楼层具有连续,结构上釉的水平窗口系统。包层板是无负载式混凝土板,安装在建筑物的建筑时。混凝土板通过焊接和用螺栓固定到建筑物的框架的钢板附着在结构上。目的是,本文将在几年内出现在该地点的观察结果,以及在评估评价中进行的测试结果。开发了一个系统,以定位和目录在面板上的可见异常;包括裂缝,暴露的钢,壁炉,弹出板和开发面板。从选择面板中取出全深核,以执行岩体分析和扫描电子显微镜/能量分散X射线微显分(SEM / EDXA)。结果表明,具有不同程度的严重程度,揭示了延迟的Ettringite形成(DEF)和碱 - 二氧化硅反应性(ASR)。具体的结论将与该项目的条件相关,以及这些异常如何影响包层系统性能。除了必要的盖子外,将讨论当前的维修和维护规定,除了将来需要的必要盖板。将制定关于建筑做法的建议,以便在未来可能避免观察到的包层面板故障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号