首页> 外文会议>International Conference on Pipelines and Trenchless Technology >A Sewer Pipeline Installation Using Pipe-jacking in Lang fang
【24h】

A Sewer Pipeline Installation Using Pipe-jacking in Lang fang

机译:在郎芳上使用管道的下水道管道安装

获取原文

摘要

This paper analyses the influencing factors based on a trial section of pipe-jacking project in the city of Langfang, which is close to Beijing. The relative weight of each influencing factors is obtained by the comparison between the field measured and theoretical calculation pipe jacking force. The authors had colligated all aspects of the influencing factors and proposed improved formula for calculating pipe-jacking force. The improved formula can predict more accurate jacking force and provide more reliable theoretical basis for slurry balance pipe jacking project design and more accurate data for the design of subsidiary facilities (such as reception shaft and exit shaft) of pipe jacking method.
机译:本文分析了基于廊坊市试验段的影响因素,廊坊市靠近北京。通过比较现场测量和理论计算管道起重力来获得每个影响因素的相对重量。作者已经展现了影响因素的各个方面,并提出了用于计算管道力的改进公式。改进的配方可以预测更准确的顶伸力,为泥浆平衡管道的沉降工程设计提供更可靠的理论基础,更准确的数据设计管道升降方法的辅助设施(如接收轴和出口轴)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号