Analysis of Generating Capacity Dynamics of the Nigerian Power System between 1963 and 2020

机译:1963和2020之间尼日利亚电力系统发电能力动态分析

获取原文

摘要

A study of the growth dynamics of the installed capacity of the Nigerian Power System from 1963 to date was done. Perspective available generating capacity was estimated based on service life of existing installed capacity. The sufficiency of generating capacity for future normal operating modes of the system was estimated based on a power load growth forecast from 2003 to 2020. An analysis of the results shows that all the installed capacity since 1963 to the late 80s would have expired by 2020 i.e. outlived their rated service lives. At present, only about 4.9 GW (80%) of total installed capacity is valid. Considering the national goal of significant economic development and estimated load forecast of over 8 GW by 2020, there is an urgent need to renovate or replace expired generating units besides the planned building of new power stations which have long gestation periods.
机译:完成了1963年迄今为止尼日利亚电力系统装机容量的增长动力学的研究。透视可用的发电能力是根据现有装机容量的使用寿命来估算的。基于2003年至2020年的电力负荷增长预测估计了系统的未来正常运行模式的发电能力。结果分析表明,自1963年至80年代后期以来的所有装机容量将到2020年到期他们评分的服务生活实行。目前,只有约4.9 GW(80%)总装机容量有效。考虑到2020年的大量经济发展和估计负荷预测的国家目标,迫切需要翻新或更换已过期的发电机,除了具有长妊娠期的新电站的建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号