Meridian Energy has recently completed an upgrade project at Aviemore power station, replacing the main generating units' Programmable Logic Controllers (PLCs), digital governor and excitation systems. Obsolete PLC hardware was replaced with a new platform, the existing digital governor software was replaced with a modern equivalent and the PLC code was predominantly ported "like-for-like" to the new platform. The obsolete excitation system was removed and replaced with a modern equivalent. The delivery of this project was undertaken internally, with the work shared across a number of design, technical support, equipment supply and construction contracts. The Aviemore upgrade project has now been completed. Although the delivery was late and the budget was stretched, all technical and operational expectations have been met. We are now implementing the knowledge and experience gained during this project on other Meridian hydro assets. This paper discusses some of the challenges faced and the lessons learned when implementing a project with multiple contractors and suppliers and significant engineering complexity.
机译:Meridian Energy最近在Aviemore Power Station完成了升级项目,取代了主要的发电机可编程逻辑控制器(PLC),数字调速器和励磁系统。已过时的PLC硬件已被新平台替换,现有的数字调控器软件被替换为现代等效,并将PLC代码主要被移植到新平台上的“类似”。除去过时的激励系统并用现代等效物代替。该项目的交付在内部进行,工作在各种设计,技术支持,设备供应和施工合同中共用。 Aviemore升级项目现已完成。虽然交货迟到了,但预算被延长,所有技术和运营期望都得到满足。我们现在正在实施在其他经络水电资产的这个项目中获得的知识和经验。本文讨论了一些挑战所面临的一些挑战和在利用多个承包商和供应商实施项目和重要的工程复杂性时所吸取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号