首页> 外文会议>International Mine Water Conference >SEDIMENT POND REMOVAL OF PRECIPITATES FROM NEUTRALIZED ACID ROCK DRAINAGE
【24h】

SEDIMENT POND REMOVAL OF PRECIPITATES FROM NEUTRALIZED ACID ROCK DRAINAGE

机译:从中和酸岩排水中去除沉淀物的沉积物池

获取原文

摘要

Water containing neutralized acid rock drainage flows from the Carlton Tunnel, an 11-kilometer long tunnel that drains the regional ground water table that includes the Cripple Creek Mining District, located the Rocky Mountains of Colorado, USA. Settling ponds are used to remove chemical sediment that forms in the approximately 88 liters/second of water that flows from the tunnel, so that the discharge water can meet Total Suspended Sediment (TSS) water quality limits. The precipitate is made up of micron-sized particles, and is extremely difficult to remove from the water by conventional sedimentation ponds. The behavior of these particles has been evaluated using physical, chemical, and optical testing of the sediment, together with physical and chemical testing of the water conveying it. The results are used to develop an advanced design for sedimentation of colloid-sized particles. The pond system has been redesigned using this method and removes sediment to below the required permit limits.
机译:从卡尔顿隧道含有中和酸岩排水的水,这是一个11公里长的隧道,排出区域地下水桌,包括克利普尔溪矿区,位于美国科罗拉多州的落矶山脉。沉降池用于去除在从隧道流动的大约88升/秒的水中形成的化学沉积物,使得排放水可以满足总悬浮沉积物(TSS)水质限制。沉淀物由微米尺寸的颗粒组成,并且极难通过常规沉降池从水中除去。已经使用沉积物的物理,化学和光学测试评估了这些颗粒的行为,以及输送水的物理和化学测试。结果用于开发胶体尺寸粒子沉淀的先进设计。池塘系统已经使用该方法重新设计,并将沉积物除去沉积物,低于所需的许可限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号