Successful Second Stage Cementation of a Multilateral Junction, After Floating in the Casing

机译:在套管中漂浮后,成功的第二阶段胶凝剂的多边交界处

获取原文

摘要

This paper presents a practical solution for successfully floating in the casing and performing second stage cementing of a multilateral junction. The drilling and completion objectives required a successful cement job on the 9-5/8"x 10-3/4" casing that would: 1. Isolate the reservoir at the 9-5/8" shoe. 2. Isolate both production legs and provide a secondary barrier against future potential B annulus communication. 3. Provide support for the 9-5/8" casing during exit window milling operations. Due to the distance between the 9-5/8" shoe and the multilateral junction point it was identified early in the planning stages that the chances of success for a good single stage cement job over the whole interval, whilst maintaining ECDs below formation fracture gradient, was minimal. With this in mind it was decided to perform the 9-5/8" cementing in 2 stages. The first stage was a conventional cement job with a total column length of 1500 ft. The next stage was conducted through a locking Port Collar with metal to metal (MTM) seals, situated at 4442ft MD. A successful cement job was achieved with a cement column of 1342ft, which was above the depth required to meet all of the objectives. After displacement of the cement the operating tool was picked up to close and lock the Port Collar. A successful casing pressure test confirmed the Port Collar was closed. All objectives were met; a world first was achieved for this combined operation.
机译:本文介绍了一种实用的解决方案,用于成功漂浮在壳体中并进行多边结的第二阶段固井。钻井和完工目标需要在9-5 / 8“x 10-3 / 4”套管上成功的水泥作业:1。将储层隔离在9-5 / 8“鞋中。2.隔离生产腿并为未来的潜在B环通信提供次要屏障。3.在出口窗口铣削操作期间提供对9-5 / 8“壳体的支持。由于9-5 / 8“鞋和多边结点之间的距离,在规划阶段的早期确定了在整个间隔内取得了良好的单一阶段水泥作业的机会,同时将ECDS维持在骨折梯度以下,很少。考虑到这一点,决定在2个阶段执行9-5 / 8“水泥。第一级是传统的水泥作业,总柱长为1500英尺。下一阶段通过锁定端口套环进行,金属与金属(MTM)密封件,位于4442英尺MD。通过1342英尺的水泥柱实现了成功的水泥作业,这是满足所有目标所需的深度。在水泥的位移后,将操作工具拾取以关闭并锁定端口套环。成功的套管压力测试证实了端口套环关闭。所有目标都有满足;为此综合行动实现了一个世界。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号