Key techniques of integral lifting of steel tube arch for Zhuzhou Bridge in Baise

机译:百斋菜钢管拱钢管拱积分升降的关键技术

获取原文

摘要

Superstructure of Zhuzhou Bridge in Baise is a combined system with strong beam and weak arch. It is combined by concrete arches of continuous rigid frame-steel tube. The construction sequence is first the beam then arch, finally the temporary pier is demolished to form the combined system. The middle three parts of steel tube arch rib in the middle span were assembled to a large unity, and it was integrally lifted by synchronous system of hoisting jack to reach positive stop. The techniques have the characteristics of fast, safe and low cost.
机译:百濑庄庄桥的超大是一个具有强烈梁和弱拱的组合系统。它由连续刚性框架钢管的混凝土拱组合。施工序列首先是梁然后拱门,最后拆除临时码头以形成组合系统。中间跨度中的钢管拱肋的中间三部分组装到大的统一,它通过吊顶千斤顶的同步系统一体地抬起,以达到正止挡。该技术具有快速,安全和低成本的特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号