首页> 外文会议>International Conference on Manufacturing Science and Engineering >Practice on No Pillar Simultaneous Extraction of Coal and Gas in Deep Mine
【24h】

Practice on No Pillar Simultaneous Extraction of Coal and Gas in Deep Mine

机译:无柱子同时提取深矿煤炭和天然气的实践

获取原文

摘要

Based on four typical mining condition, such as implementation gob-side entry retaining under sandstone roof, long length and long time gob-side entry retaining, implementation gob-side entry retaining under mudstone roof and implementation gob-side entry retaining at depth of more than 900 m, this paper analysis the roadway maintenance-control in no pillar simultaneous extraction of coal and gas engineering, research on the roadway maintenance-control technology during exploitation and before mining, further study typical convergence characteristics of gob-side entry retaining after mining, drew in application of no pillar simultaneous extraction of coal and gas in deep mine, proposed evaluation about the project current existing problems and development trends.
机译:基于四种典型的采矿条件,如实施GOB侧入口保留在砂岩屋顶下,长度长,长时间的GOB侧进入挡住,实现GOB侧进入保留在泥岩屋顶和实施GOB侧进入挡住深度更多本文分析了900米,巷道维修控制在煤气工程中没有柱子的同时提取,研究挖掘和采矿前的道路维修控制技术,进一步研究了采矿后凝固凝固率的典型收敛特性,制定了在深矿中没有柱子同时提取煤气和天然气,提出了对项目现有问题和发展趋势的评价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号