首页> 外文会议>International conference on dam safety management >Earth Dam Breaking: the Process and Mechanism
【24h】

Earth Dam Breaking: the Process and Mechanism

机译:地球坝断裂:过程和机制

获取原文

摘要

Breach formation and development in earth dams is a complicated process depending on many factors and varies greatly from case to case. Despite the numerous studies conduc-ted, the knowledge of the breach erosion mechanism in earth clams is still rather poor. In the present study, based on observation of prototype earth dam breaking and experiments in the laboratory and in the field, the process and mechanism of earth dam breaking due to over-flowing has been investigated and described. The whole breach erosion process in earth clams can be generally distinguished into four stages. During the first stage, the overtopping flow lowers the dam crest and steepens the downstream slope of the clam until a certain critical an-gle is arrived. Then in Stages Ⅱand Ⅲ, flow shear erosion, dam foundation scour and head-cut mass wasting occur and weaken the dam body until the dam is completely broken through at the end of Stage Ⅲ. For the last stage (i. e. Stage Ⅳ), breach erosion takes place mainly laterally.
机译:地球坝的突破形成和开发是一个复杂的过程,具体取决于许多因素,而案例差异很大。尽管有许多研究融合了,但地球蛤蜊的违规侵蚀机制仍然相当差。在本研究中,基于在实验室和实验室中的原型地球坝破裂和实验的观察,研究了并描述了由于过流的地球坝破裂的过程和机制。地球蛤蜊中的整个违规侵蚀过程通常可以分为四个阶段。在第一阶段,拓扑流量降低了坝嵴,并尖锐的蛤蜊下游斜率,直到到达某个临界AN-GLE。然后在阶段Ⅱ,流动剪切腐蚀,大坝基础冲刷和头切质量浪费发生,削弱了坝体,直到Ⅲ阶段Ⅲ末端彻底突破。对于最后阶段(即阶段ⅳ),违规侵蚀主要横向发生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号