THE NEXT STEP CHANGE IN THE SIZE OF MINING PROJECTS

机译:挖掘项目大小的下一步变化

获取原文

摘要

The issues that face the mine operator trying to push into that multiple millions of tonnes per day of material movement are largely logistic in nature. A throughput of 4 - 5 Mtpd can be delivered out of a mine by trucks, but only when the pit can support at least three "permanent" exit ramps. Entry, departure and merging lanes on roadways are required for those high volume haul roads to operate effectively. If pit configurations don't allow three exit ramps, traffic density might preclude the truck operation and then conveyors could be employed to transport material out of the pit. Conveyors don't necessarily need ramps, they can use ore-passes and tunnels outside the pit shell.
机译:面对矿井操作员试图推进每天数百万吨的材料运动的问题在很大程度上是物流。 4 - 5 MTPD的吞吐量可以通过卡车从矿井中送出,但只有当坑可以支撑至少三个“永久”出口坡道时。在高速运输路上有效运作,需要在道路上进行进入,出发和合并通道。如果坑配置不允许三个出口坡道,则流量密度可能会排除卡车操作,然后可以采用输送机从坑中运输材料。输送机不一定需要坡道,它们可以在坑外壳外使用矿石和隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号