首页> 外文会议>SME annual meeting exhibit >HAILE GOLD MINE METALLRGY AND FLOWSHEET REVIEW
【24h】

HAILE GOLD MINE METALLRGY AND FLOWSHEET REVIEW

机译:Haile金矿金属融合和流程思考

获取原文

摘要

Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through several operating periods since. The relatively low grade and refractory nature of the deposit has been a challenge for efficient processing since the start of mining on the property. Early processing techniques included gravity separation and barrel chlorination. The last operation employed heap leaching in 1985 through 1992. After being closed and reclaimed for over 20 years, the property is poised to re-open and produce once again. In this chapter of the Mine's legacy, flotation and ultra-fine grinding will be employed to achieve economic extraction of gold and silver from the pyrite. This paper briefly reviews some of the mine's history, the metallurgical testing, the flowsheet and discusses design considerations.
机译:Haile Gold Mine酒店靠近南卡罗来纳州Kershaw,南卡罗州夏洛特南部约50英里。黄金首次在1827年在该网站发现,该物业已通过几次运营期。自挖掘开采以来,矿床的相对较低的等级和难以解决的性质对高效处理的挑战是挑战。早期加工技术包括重力分离和桶氯化。最后一次操作在1985年至1992年采用堆浸出。在20多年后关闭并回收后,该物业准备重新开放并再次生产。在矿山的遗产的本章中,将采用浮选和超细研磨,从黄铁矿中实现经济提取金银。本文简要介绍了一些矿山的历史,冶金测试,流程图,并讨论了设计考虑因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号