【24h】

HAILE GOLD MINE METALLRGY AND FLOWSHEET REVIEW

机译:海尔金矿的冶金学和流程图

获取原文

摘要

Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through several operating periods since. The relatively low grade and refractory nature of the deposit has been a challenge for efficient processing since the start of mining on the property. Early processing techniques included gravity separation and barrel chlorination. The last operation employed heap leaching in 1985 through 1992. After being closed and reclaimed for over 20 years, the property is poised to re-open and produce once again. In this chapter of the Mine's legacy, flotation and ultra-fine grinding will be employed to achieve economic extraction of gold and silver from the pyrite. This paper briefly reviews some of the mine's history, the metallurgical testing, the flowsheet and discusses design considerations.
机译:海尔金矿位于南卡罗来纳州的克肖附近,在北卡罗来纳州夏洛特以南约50英里处。黄金最早是在1827年在该地点发现的,此后经历了几个运营时期。自从开始开采该矿床以来,矿床相对较低的品位和耐火性质一直是有效加工的挑战。早期加工技术包括重力分离和桶式氯化。上一次操作是从1985年到1992年进行堆浸。在关闭并回收20年后,该物业准备重新开放并再次生产。在矿山遗产的这一章中,将采用浮选和超细磨来从黄铁矿中经济地提取金和银。本文简要回顾了一些矿山的历史,冶金测试,流程图,并讨论了设计注意事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号