首页> 外文会议>International Conference on Energy and Environment Technology >Simulation System on the Thermal Stress and Fatigue Life Loss of Startup and Shutdown for a Domestic 600MW Steam Turbo generator Unit
【24h】

Simulation System on the Thermal Stress and Fatigue Life Loss of Startup and Shutdown for a Domestic 600MW Steam Turbo generator Unit

机译:仿真系统对国产600MW蒸汽涡轮发电机单元启动和疲劳损失的热应力和疲劳损失

获取原文

摘要

The Simulation System on the thermal stresses and fatigue life loss of the rotator during startup and shutdown for a domestic 600MW steam turbo generator unit, By means of the analysis of Simulation System on the thermal stress and life loss of the rotor, and we could know that the surface of the shaft was suffered a crushing stress, but it was a pulling stress when a unit shut down. The max thermal stress and the max combined stress produced on the rotor of the medium pressure cylinder was about 18% bigger than those on the rotor of the high pressure cylinder when they had the same increase rate of temperature. When thought from economics and safety, the optimal temperature-increasing-rate of the rotor is 1.8°C per minute when the generator start-up at cool state, and the optimal temperature-increasing-rate of the rotor is 2.0°C per minute when the generator start-up at hot state. When shut down the unit, it's optimal for slipping-parameter, and the optimal temperature-decreasing-rate of the rotor is 0.8°C per minute.
机译:仿真系统对国产600MW蒸汽涡轮发电机单元启动和关闭期间旋转器的热应力和疲劳寿命,通过分析仿真系统对转子的热应力和寿命丧失,我们可以知道轴的表面遭受破碎应力,但是当单位关闭时它是拉伸应力。当它们具有相同的温度速度时,在中压缸的转子上产生的最大热应力和最大组合应力比高压缸的转子大约18%。当从经济和安全性思考时,当在冷却状态下发电机启动时,转子的最佳温度升高速率为1.8°C,并且转子的最佳温度升高率为每分钟2.0°C当发电机在热状态启动时。当关闭单位时,滑动参数最佳,转子的最佳温度降低速率为0.8°C /分钟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号