首页> 外文会议>International Conference on Management and Service Science >Optimizing Scheme of Concrete Large Dam Temperature Operation
【24h】

Optimizing Scheme of Concrete Large Dam Temperature Operation

机译:混凝土大坝温度运行优化方案

获取原文

摘要

During concrete dam construction, optimizing temperature measurement scheme prevents dam cracking due to temperature fluctuation in concrete dam leads cracking produce. In paper, the temperature operation optimizational model was established from three aspects (Variance selection, object function and constraint condition).Additionally, the temperature optimizing model was implemented in reality dam construction to analysis temperature measurement and gain conclusion which post-temperature measurement is much better than pre-cool measurement.
机译:在混凝土坝施工中,优化温度测量方案防止由于混凝土坝中的温度波动引起的坝裂化引线裂缝产生。在纸质中,从三个方面(方差选择,对象和约束条件)建立了温度运行优化模型。加法,温度优化模型在现实大坝施工中实现了分析温度测量和增益结论的温度测量很大优于预热测量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号