首页> 外文会议>2010 International Conference on Management and Service Science >Optimizing Scheme of Concrete Large Dam Temperature Operation
【24h】

Optimizing Scheme of Concrete Large Dam Temperature Operation

机译:混凝土大坝温度运行优化方案

获取原文

摘要

During concrete dam construction, optimizing temperature measurement scheme prevents dam cracking due to temperature fluctuation in concrete dam leads cracking produce. In paper, the temperature operation optimizational model was established from three aspects (Variance selection, object function and constraint condition).Additionally, the temperature optimizing model was implemented in reality dam construction to analysis temperature measurement and gain conclusion which post-temperature measurement is much better than pre-cool measurement.
机译:在混凝土大坝施工过程中,优化的温度测量方案可防止由于混凝土大坝导水线开裂产生的温度波动而导致大坝开裂。本文从方差选择,目标函数和约束条件三个方面建立了温度运行优化模型。另外,在实际大坝施工中实施了温度优化模型,以分析温度测量结果,得出后温度测量结果多的结论。比预冷测量更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号