首页> 外文会议>IEEE Bucharest PowerTech >Dispatch of Head Dependent Hydro Units: Modeling for Optimal Generation in Electricity Market
【24h】

Dispatch of Head Dependent Hydro Units: Modeling for Optimal Generation in Electricity Market

机译:宣传头依赖性水力装置:电力市场中最佳发电的建模

获取原文

摘要

Deregulation and liberalization of electric power industry, among other things, has created new requirements for the market participants. The power system engineer, operator, and, in general, the market participant is being faced with requirements for which he does not have adequate training and the proper software tools. In this framework, among others, a pure hydro-generation company has to (1) operate its hydro units, throughout the operating day, trying to fulfill the market clearing schedule, and modify the program in the intra-day energy markets if necessary (or more suitable) as real-time operation is getting closer and (2) make the offers for the regulation service market. In this scenario the Dispatch of Head Dependent Hydro Units is a problem that must be solved before dealing with the hourly hydro resource scheduling for energy and reserve optimization.
机译:除其他外,电力行业的放松管制和自由化为市场参与者创造了新的要求。电力系统工程师,操作员,以及一般的市场参与者正在面临其未提供足够培训和适当的软件工具的要求。在这一框架中,其中一个纯水电发电公司必须(1)在整个营业日运营其水力单位,试图满足市场清算计划,并在必要时修改日内能源市场的计划(或者更适合)作为实时操作越来越近,(2)为监管服务市场提供优惠。在这种情况下,头依赖性水电站的调度是一个问题,必须在处理能量和储备优化的每小时水电调度之前解决。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号