首页> 外文会议>International Conference on Future Computer and Communication >Development of an Optimal Real-time Coal Dispatch Scheme for Coal Power Plants Based on the Priority
【24h】

Development of an Optimal Real-time Coal Dispatch Scheme for Coal Power Plants Based on the Priority

机译:基于优先级的煤发电厂优化实时煤炭调度方案的开发

获取原文

摘要

For optimizing the operations of coal dispatch systems in a coal power plant, this research is to develop a real-time coal dispatch scheme on the basis of the priorities assigned to the coal hoppers of the dispatching system. A new coal danger index is provided. This scheme shows advantages for the operations of a dispatching system with multiple-hoppers, in terms of expanding equipment life, reducing work load of the workers and increasing operation efficiency under the condition of safety assurance for the power generation operations.
机译:为了优化煤发电厂中的煤炭调度系统的运营,本研究是根据分配给调度系统的煤料人的优先事项来开发实时煤炭调度方案。提供了一种新的煤炭危险指数。该方案表明,在扩展设备寿命方面,在扩展设备寿命方面,在扩展设备寿命方面,以及在发电操作的安全保障条件下,减少工人的工作负荷以及提高运行效率的优点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号