首页> 外文会议>CIGRE/IEEE PES Joint Symposium on Integration of Wide-Scale Renewable Resources Into the Power Delivery System >BC Hydro perspective on distribution islanding for customer reliability improvement
【24h】

BC Hydro perspective on distribution islanding for customer reliability improvement

机译:BC水电分配岛屿客户可靠性改进

获取原文

摘要

BC Hydro, one of the largest electrical utilities in Canada, has experienced a substantial growth in distributed generating sources that are connected to its Distribution System (12 kV, 25 kV and 34.5 kV). These Power Generators (PGs) are mostly run-of-river hydraulic generating plants with capacities ranging from 1.0 to 15.0 MW. This increment in the number of independent power producers (IPPs) is the result of an aggressive energy acquisition plan to meet provincial renewable energy targets.
机译:BC Hydro是加拿大最大的电气公用设施之一,在分布式发电源上经历了大量的增长,这些源连接到其分配系统(12 kV,25 kV和34.5 kV)。这些发电机(PGS)主要是河流液压发电机,其能力从1.0到15.0 mW。在独立电力生产商(IPPS)的数量中,这种增量是攻击能源采集计划,以满足省级可再生能源目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号