首页> 外文会议>International Joint Conference on Computational Sciences and Optimization >Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
【24h】

Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling

机译:优化随机资源约束项目调度的启发式算法

获取原文

摘要

This paper presents a newly developed resource constrained project scheduling method in stochastic networks by using critical chain concept. The objective of the presented model is defined as minimizing the multiplication of expected project duration and its variance. This paper suggests a competition routine by implementing a policy to maximize the total contribution of selected activities in reducing the expected project duration and its variance. In this respect, a heuristic algorithm is developed and compared with the other existing methods.
机译:本文通过使用关键链概念介绍了随机网络中的新开发的资源受限项目调度方法。呈现模型的目的被定义为最小化预期项目持续时间及其方差的乘法。本文建议通过实施策略来最大限度地提高所选活动的总贡献,以降低预期的项目持续时间及其方差。在这方面,开发出启发式算法并与其他现有方法进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号