This paper presents a newly developed resource-constrained project scheduling method in stochastic networks by using critical chain concept. The objective of the presented model is defined as minimizing the multiplication of expected project duration and its variance. This paper suggests a competition routine by implementing a policy to maximize the total contribution of selected activities in reducing the expected project duration and its variance. In this respect, a heuristic algorithm is developed and compared with the other existing methods.
机译:本文提出了一种新的基于关键链概念的随机网络中资源受限的项目调度方法。提出的模型的目标是将预期项目工期及其方差的乘积最小化。本文通过实施一项旨在最大程度地减少所选项目预期工期及其方差的选定活动的总贡献的政策,提出了一项竞赛常规。在这方面,开发了一种启发式算法并将其与其他现有方法进行比较。