首页> 外文会议>Topical Meeting on Advances in Nuclear Fuel Management >TESTING 3-D NODAL CODES SIMULATE-3/5 FOR REFUELINGSHUTDOWN MARGIN PREDICTIONS WITH CASMO-5M
【24h】

TESTING 3-D NODAL CODES SIMULATE-3/5 FOR REFUELINGSHUTDOWN MARGIN PREDICTIONS WITH CASMO-5M

机译:测试3-D节点代码模拟-3 / 5用于加油,用于Casmo-5M的加油保证金预测

获取原文

摘要

Reactor shutdown refueling is a crucial task for BWR operations. In this paper, based on a realistic BWR core refueling sequence, the SIMULATE-3 and SIMULATE-5 shutdown margin (SDM) predictions are benchmarked against CASMO-5M results. The 2-D core in this exercise is established from the middle plane of a typical 748-bundle BWR core. There are thousands of fuel move steps from the end of previous cycle to the beginning of next cycle, most of which are so-called partially loaded core configurations where empty fuel locations are filled with water. During this process, eigenvalue predictions from CASMO-5M and SIMULATE-3/5 are compared for the all-rod-in (ARI) case and the ARI except the maximum-worth rod (ARI-M) case. Based on more advanced neutronic models, SIMULATE-5 shows sizable improvements in agreeing with the CASMO-5M reference solution over the SIMULATE-3 results for partially loaded cores.
机译:反应堆关机加油是BWR操作的关键任务。本文基于现实BWR核心加油序列,模拟-3和模拟-5关闭余量(SDM)预测是针对Casmo-5M结果的基准测试。该练习中的2-D核心是从典型的748束BWR核心的中间平面建立的。从先前循环结束到下一个循环开始时有数千个燃料移动步骤,其中大多数是所谓的部分加载的核心配置,其中空燃料位置填充有水。在此过程中,与Casmo-5M和模拟-3 / 5的特征值预测与除最大值杆(ARI-M)案例外的全杆(ARI)壳体和ARI进行比较。基于更先进的中性模型,模拟-5显示了同意CASMO-5M参考解决方案,在模拟-3结果上达成了适用于部分加载的核心的可大幅度改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号