首页> 外文会议>International Conference on Mine Closure >Lessons learned from closure of mine facilities
【24h】

Lessons learned from closure of mine facilities

机译:从矿山设施关闭的经验教训

获取原文

摘要

Mine facilities decommissioning, closure, and rehabilitation have been conducted at sites in the Western Hemisphere (in particularly the Western United States) for several decades. This time period has allowed the planning, permitting, closure, and post-closure performance to be evaluated. This paper outlines the primary lessons learned from involvement at a number of sites in various climate and topographical settings. From these examples, the primary closure issues discussed in the paper include: (1) post-closure property control and land use; (2) stakeholder relationships and commitments; (3) residual waste material management; (4) design period and post-closure maintenance; (5) water management (before, during, and after closure), and (6) socio-economic impacts.
机译:矿山设施退役,关闭和康复已经在西半球(特别是西部)几十年中进行的遗址。此时间段允许评估规划,允许,闭合和闭合后性能。本文概述了从各种气候和地形设置中参与许多网站的主要经验教训。从这些例子来看,本文讨论的主要闭合问题包括:(1)后关闭物业控制和土地利用; (2)利益相关者的关系和承诺; (3)残余废料管理; (4)设计期和后闭后维护; (5)水管理(在闭幕之前,期间和后),和(6)社会经济影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号