首页> 外文会议>International Conference on Mine Closure >Improving fish habitat productivity through controlled dam removals and fishway construction as part of a reclamation plan
【24h】

Improving fish habitat productivity through controlled dam removals and fishway construction as part of a reclamation plan

机译:通过受控坝移除和鱼道建设提高鱼类栖息地生产力作为填海计划的一部分

获取原文

摘要

Mining sites are frequently equipped with dams and reservoirs for water supply. At the time of closure, the dam decommissioning represents an important component of reclamation programmes. Several small dams in North America are reaching the end of their lifespan and the removal process is becoming an increasingly popular technique in the restoration offish habitats. During the reclamation process at the Heath Steele Mine (NB, Canada), approximately 90 km2 of drainage basin area has been reopened to fish migration in the North Branch of the Miramichi River system through dam removals and modifications to existing obstructions.
机译:采矿地点经常配备水坝和水库供水。在关闭时,大坝退役代表了填海计划的重要组成部分。北美的几座小型水坝正在达到他们的寿命结束,去除过程正在成为恢复疾病栖息地的越来越流行的技术。在Heath Steele Mine(加拿大NB)的回收过程中,通过坝移除和对现有障碍物的修改,重新打开了大约90平方公里的排水盆地区域,以便在Miramichi河系统的北枝上进行鱼迁移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号