首页> 外文会议>International Conference on Mine Closure >Methods for simulating measured field responses for long-term performance of mine waste cover systems
【24h】

Methods for simulating measured field responses for long-term performance of mine waste cover systems

机译:用于模拟测量矿井废物覆盖系统的长期性能的现场响应的方法

获取原文

摘要

Mine waste cover systems are typically a key component of mine closure plans. For this reason, and because cover systems generally encompass a large component of mine closure costs, it is critical that an acceptable level of risk in determining long-term cover system performance is achieved. Numerical simulations using computers are the most common tool used to evaluate the long-term water balance of mine waste cover systems. However, the accuracy of such simulations is dependent on the quality of data available to determine model inputs. The preferred method for ensuring the most representative model inputs are used is to simulate past performance of the cover using data generated from field performance monitoring, referred to as a field response model. The inputs from a model that provides a representative simulation of measured field responses can then be used as a basis for evaluating long-term mine waste cover system performance.
机译:矿山废物覆盖系统通常是矿井封闭计划的关键组成部分。因此,由于覆盖系统通常包含矿井闭合成本的大量组件,因此实现了确定长期覆盖系统性能的可接受风险水平至关重要。使用计算机的数值模拟是用于评估矿井废覆盖系统的长期水平衡的最常见工具。然而,这种模拟的准确性取决于可用于确定模型输入的数据的质量。使用用于确保最代表性的模型输入的优选方法是使用从场性能监视的数据产生的数据来模拟盖子的过去性能,称为场响应模型。然后,可以使用提供测量场响应的代表性模拟的模型的输入作为评估长期矿井废物覆盖系统性能的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号