首页> 外文会议>International Conference on Computer Sciences and Convergence Information Technology >The housing post-disaster reconstruction layout research of Lueyang county after the May 12th earthquake
【24h】

The housing post-disaster reconstruction layout research of Lueyang county after the May 12th earthquake

机译:5月12日地震后丽阳县灾后灾后重建灾区研究

获取原文

摘要

At 14:28 on May12th, 2008, Sichuan province was happened an 8.0 level big earthquake disaster, made a significant casualties and severe economic loss to the town of lueyang in shaanxi province. About earthquake relief and rebuilding their homes as the most concerned to the people in the whole country. Under these backgrounds, the paper evaluates & analyses the housing post-disaster reconstruction of Lueyang county seat based on analyzing the domestic and overseas housing rebuilding layout, Develop post-disaster housing reconstruction program planning, we bring forward interfix advices of housing reconstruction & the statement. The layout research can provide scientific gist for the housing post-disaster reconstruction layout of Lueyang county seat after the post-disaster earthquake.
机译:在2008年5月14日的14:28,四川省发生了8.0级大地震灾害,为陕西省丽阳镇做出了重大伤亡和严重的经济损失。关于地震救济和重建家庭,因为最关注全国人民的人民。在这些背景下,本文评估并分析了丽阳县席位的住房灾后重建,基于分析了国内外房屋重建布局,发展灾后住房重建计划规划,我们提出了外部住房重建的Interfix建议和该声明。布局研究可以为灾后地震后丽阳县座位灾后灾后重建布局提供科学的主旨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号