首页> 外文会议>International conference on risk analysis and crisis response >Risk Evaluation of Berthing and Departing of LNG Carrier for Yangkou Port
【24h】

Risk Evaluation of Berthing and Departing of LNG Carrier for Yangkou Port

机译:阳口港液化天然气港的风险评估

获取原文

摘要

As a source of clean energy, liquefied natural gas (LNG) has an increasingly wide range of applications in China. At present, China's LNG imported from overseas is on the sea mode of transport. Jiangsu Yangkou Port LNG receiving stations to meet growing domestic demand for growth in LNG production and the designed ship is the Q-MAX LNG vessel which is the newest LNG ship size on the world. This paper is based on the ship handling simulator to have risk assessment of LNG vessel berthing and departing the terminal. According to the simulation experimentations the conditions that have greater influence to the operation of berthing and departing can be selected through combination of the ownership sub-system and environment sub-system and tug sub-system, then carry out further experimentations and data analysis, eventually establish the appropriate model to evaluate LNG vessel's risk for berthing and departing. The conclusion can provide scientific reference for the configuration of tug and risk control when the port is open.
机译:作为清洁能源的来源,液化天然气(LNG)在中国具有越来越广泛的应用。目前,中国的液化天然气从海外进口是在海上运输方式。江苏阳口港口液化天然气收到电台以满足日益增长的国内对液化天然气生产增长的需求,设计的船舶是Q-Max LNG船,这是世界上最新的液化天然气船舶规模。本文基于船舶处理模拟器,以对LNG船只的风险评估和离开终端。根据仿真实验,通过所有权子系统和环境子系统和拖动子系统的组合,可以选择对Betthing和Deposition的操作产生更大影响的条件,然后进行进一步的实验和数据分析,最终建立适当的模型,以评估LNG船只的抵达和离开的风险。结论可以为端口打开时为拖船和风险控制的配置提供科学参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号