首页> 外文会议>International Seminar on Safe and Rapid Development Mining >Hydroscaling technology for rapid drift development
【24h】

Hydroscaling technology for rapid drift development

机译:快速漂移开发的水上张开技术

获取原文

摘要

Rapid drift development is still a high priority for many mining companies, as it can reduce costs and also access orebodies faster to increase net present values significantly for any operation. Hydroscaling (water jet scaling) trials have been conducted at various mine sites in Canada and also at Perseverance Mine, Western Australia, Australia, to evaluate this as a potential technology to enhance rapid drift development. The technology in each of these cases removed most of the loose rock within the different rock mass conditions experienced. The success of hydroscaling was measured by either checking the scaling manually or monitoring the shotcrete spraying activity afterwards to monitor rockfalls. During shotcreting, prior to the trials, rockfalls always occurred, whilst there was minimal rockfall after hydroscaling. Monitoring of the shotcrete spraying process prior to trials, and after hydroscaling, has demonstrated an improvement in reduced rock and shotcrete fall out, with commensurate reduction in re-work required. This paper proposes that hydroscaling is now ready for implementation as a technology across a wide range of rock mass conditions and summarises the role for technology within a rapid drift development context.
机译:许多矿业公司的快速漂移开发仍然是一个高度优先事项,因为它可以降低成本,并且还可以更快地增加缺点,以便对任何操作显着增加净目的价值。加拿大各种矿山的水上级(水喷射缩放)试验还在澳大利亚西澳大利亚西澳大利亚的普终矿山,以评估这一潜在技术,以提高快速漂移的发展。这些情况中的每个案例中的技术除以不同的岩石质量条件内的大部分松散岩石。通过手动检查缩放或者以后监测喷射克雷特喷洒活动来测量水中的成功。在喷射期间,在试验之前,岩石总是发生,同时在水上升降后很少有岩石。在试验之前监测喷射晶状体喷涂过程,并在水中进行后,证明了减少的岩石和喷射器脱落的改善,并在需要重新工作的情况下减少。本文提出,水上升降现已准备好实施在各种岩石质量条件下的技术,并总结了在快速漂移发展背景下的技术作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号