A new hole-cleaning process applied in a PDVSA Servicios Drilling Project,in the Heavy Oil Orinoco Belt,Bolivarian Republik of Venezuela saved 3 rig days and reduced the stuck-pipe risk and avoided damage to the MWD/LWD BHA and PDC bit.A long sought solution for effective wellbore cleaning was validated.Applied the first time,this concept provides a novel integrated solution for hole-cleaning,is transferrable to other well construction projects,is reducing project costs,lessens lost-in-hole BHAs and significantly reduces flat drilling time&invisible lost time. Effective hole-cleaning is the main challenge of any deviated drilling operation,with problems in cuttings and cuttings beds removal.Even optimized mud flow rates,with reciprocal and rotational pipe movements physically cannot completely remove cutting beds.The herewith presented solution consti-tutes to incorporate a non-rotational scraper assembly into the drill string,applied together with an engineered and optimized hole-cleaning process. With no access to dedicated casing cleaning tools,the 9 5/8”casing was cleaned from cuttings by back-reaming inside the casing with the BHA drill string,requiring minimum 2-3 runs and 2 days,and causing excessive wear on casing,BHA and PDC bit.After drilling the 8?”section,the new concept was to place a non-rotational scraper assembly into the drill string,allowing only minimum POOH of DP stands as part of the scheduled final openhole wiper trip activity,followed by RIH back to TD–and as such completing the openhole wiper trip without the need of tripping the drill string to surface.The tested solution eliminated all back-reaming inside casing and ensured a full 360°casing contact cleaning prior to RIH the liner,guaranteeing the casing is free of cuttings and also eliminating any additional round nose mill trips.The scraper never moved outside the 9 5/8”casing.This first application of RIH a scraper as part of the drill string gave outstanding results with 3 rig days been saved and a smooth RIH of the liner.
机译:一种新的孔清洗过程中PDVSA SERVICIOS钻探工程应用,在重油奥里诺科腰带,委内瑞拉玻利瓦尔REPUBLIK保存3天钻机和减少卡住的管风险和避免了对MWD / LWD BHA和PDC bit.A损坏为有效井筒清洁长期寻求解决方案是validated.Applied第一次,这一概念提供了一种用于孔清洗了一种新集成的解决方案,是移植到其他公建设项目,正在降低项目成本,减轻失在孔的BHA和显著降低平坦钻井时间和不可见时间损失。有效孔清洗是任何偏离钻井作业的主要挑战,在removal.Even优化泥浆流速,与往复和旋转运动管物理岩屑和钻屑床的问题不能完全去除切割beds.The特此提出的解决方案consti-tutes到组件包括一个非转动刮刀到钻柱,用工程化和优化空穴清洗工艺一起应用。由于没有获得专用外壳清洁工具,9 5/8” 的套管是由回扩孔与BHA钻杆套管内,最少需要2-3道和2天,造成对套管过度磨损屑清洗, BHA和PDC bit.After 8?”部分钻孔,新概念是组件放置一个非旋转刮刀到钻柱,只允许DP的最低POOH站作为计划的最终裸眼雨刮行程活动,随后的一部分RIH回TD-并且这样完成,而不需要跳闸钻柱surface.The测试溶液的裸眼井刮水器跳闸消除了所有后面扩孔内壳体,并确保一个完整的360°壳体接触清洁到RIH衬里,保证现有外壳是自由切削的,也消除了任何额外的圆鼻磨trips.The刮从未迁移RIH的9 5/8” casing.This第一应用刮刀作为钻柱的一部分给了优秀结果与已有3台天外保存并作为内衬的mooth RIH。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号