Abandonment of 19 Subsea Wells in the Jabiru/Challis Fields

机译:放弃Jabiru / Challis领域的19个海底井

获取原文

摘要

This paper describes the pre-planning and execution of Australia’s largest subsea well abandonment campaign to date.The Jabiru/Challis Fields are located in the Timor Sea 640km from Darwin,Australia. The fields were discovered in 1983/84 with first production in 1986 and reached the end of their economic life in 2010.The fields consisted of 13 subsea producers and 6 suspended/partially abandoned wells making it a 19 subsea well abandonment programme. A semi-submersible rig was selected over a jack-up primarily based on water depth and subsea hardware handling capability considerations.Abandonment solely using a construction vessel was discounted due to the age and condition of the wells and associated risks of using coiled tubing. The condition of the wells required detailed barrier management.The main challenge was to maintain adequate barriers throughout the abandonment programme when some of the standard barriers did not exist to begin with.A number of the barriers that were in place during the well construction were no longer present.The Drilling Contractor was fully engaged to ensure single barrier operations were acceptable. Drawing on the experience gained in the North Sea,the Oil&Gas UK Guidelines for the Suspension and Abandonment of Wells were adopted. With numerous known well issues and more potential unknown issues,coupled with significant logistical challenges,contingency planning was vital.By the end of the campaign,problems encountered included corroded casing,corroded/parted/collapsed tubing,iron sulphide scale,naturally occurring radioactive material(NORM),H2S,non-functioning tubing retrievable surface controlled subsurface safety valves(TRSCSSVs)and blocked perforations. Significant use of construction vessels was made pre and post rig activities.A programme change during the campaign resulted in the storage of subsea hardware assemblies on the seabed for later retrieval by a construction vessel.This was a safer and lower cost option than recovery to the rig.
机译:本文介绍了澳大利亚最大的海底遗弃活动的预先规划和执行到目前为止.Jabiru / Challis领域位于距澳大利亚达尔文640公里640km。该领域于1983/84年发现,1986年首次生产,并于2010年达到了经济生活的结束。该领域由13个海底生产者和6个暂停/部分被遗弃的井,使其成为19个海底遗弃计划。在主要基于水深和海底硬件处理能力考虑的升降机上选择了半潜式钻机。由于井的年龄和条件以及使用卷绕管道的相关风险,仅使用建筑船只的折扣是折扣的。井的状况需要详细的障碍管理。当一些标准障碍不存在时,主要挑战是在整个遗弃计划中保持足够的障碍,因为一些标准的障碍开始。在井建设中到位的障碍的数量是没有较长的现在。钻井承包商完全参与,以确保单级障碍运营是可接受的。采纳了北海中获得的经验,采用了悬挂和遗弃井的石油和天然气英国指南。随着许多知名的井问题和更有潜在的未知问题,与重大后勤挑战相结合,应急计划至关重要。在活动结束时,遇​​到的问题包括腐蚀套管,腐蚀/分开/倒塌的管,硫化铁秤,天然存在的放射性物质(符号),H2S,非功能性管道可检索的表面控制地下安全阀(TRSCSSV)和堵塞的穿孔。显著使用施工船的是在竞选期间提出的前置和后置钻机activities.A程序变化导致的海底硬件组件在海底,供以后检索存储由建设vessel.This是一个更安全,比恢复到成本较低的选择钻机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号