首页> 外文会议>NATC North Africa Technical Conference Exhibition >A Case Study of Oil-Based Mud Effect on Horizontal-Well Productivity
【24h】

A Case Study of Oil-Based Mud Effect on Horizontal-Well Productivity

机译:对水平井生产率的油基泥浆效应的案例研究

获取原文

摘要

Completing horizontal wells with openhole sections or non-cemented liners is a common practice. This type of openhole wells is preferred to maximize reservoir productivity. Some questions that always come up for this type of wells are: will it be necessary to cleanup the mud and filtercake from the openhole section before or while starting production? Will the filtercake disperse and get removed while producing the well and applying drawdown to the formation? Will the remaining filtercake impair well productivity? The paper presents the case of a gas producing horizontal well in Indonesia completed with a perforated liner. The target reservoir is a clean sandstone reservoir. The horizontal drain is 1155 feet (ft) long. The reservoir permeability is ranging between 0.1 and 5 millidarcies (mD) An engineered oil-based mud was used as drill-in fluid to prevent any damage to the reservoir. A carbonate particle-based filtercake was used to create a thin and reliable filter cake. While drilling this well, it was believed that reservoir damage was minimized. It was also believed that there would be no need to cleanup the mud and filtercake left in the hole and that the well would cleanup by itself easily once it started producing. After disappointing production results from this well, zero production was achieved, a decision was taken to investigate the effect of the mud on well productivity, consecutive interventions were planned to remove one potential damage mechanism at a time and investigate the effect on well performance. Upon the completion of all the intervention steps, the well started to produce. A pressure buildup test performed one month after the intervention showed that the well was producing with a damage skin value of zero. The different interventions, the laboratory results and the effect of each taken step on well productivity are discussed in this paper. Overall results of the interventions will be shown and a complete solution for bringing new openhole horizontal wells into production will be proposed.
机译:用透露孔部分或非胶结衬垫完成水平井是一种常见的做法。这种类型的透露孔是优选的,以最大化储层生产率。始终出现这种类型的井的一些问题是:在开始生产之前或同时,有必要从露孔部分清理泥浆和滤饼吗?滤波器会分散并在产生井的同时删除并将缩减施加到地层吗?剩下的滤饼会损害良好的生产力吗?本文呈现出在印度尼西亚生产水平井的气体的情况,用穿孔衬里完成。目标水库是一种清洁的砂岩储层。水平排水管为1155英尺(FT)。储层渗透率在0.1和5毫越(MD)之间的范围范围为0.1和5毫(MD)工程化油基泥浆用作钻孔流体,以防止对储层的任何损坏。使用碳酸盐颗粒基滤饼来产生薄且可靠的滤饼。在钻井时,据信储层损坏最小化。还有人认为,一旦开始生产,就不需要清理洞中留下的泥浆和滤饼,并且很容易清理。在令人失望的生产结果井之后,实现了零产量,采取了一个决定来调查泥浆对井生产力的影响,计划一次连续干预措施去除一个潜在的损伤机制,并调查对井性能的影响。完成所有干预步骤后,良好的开始生产。干预后一个月的压力累积试验表明井的损伤皮肤值为零。本文讨论了不同的干预措施,实验室结果和每次采取良好生产力的效果。将显示干预措施的总体结果,并提出了将新的露天水平井带入生产的完整解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号