首页> 外文会议>Seismic Engineering Conference >Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis
【24h】

Crossing Active Faults on the Sakhalin II Onshore Pipeline Route: Pipeline Design and Risk Analysis

机译:在Sakhalin II陆上管道路线上穿过积极故障:管道设计和风险分析

获取原文

摘要

Twin oil (20 & 24 inch) and gas (20 & 48 inch) pipeline systems stretching 800 km are being constructed to connect offshore hydrocarbon deposits from the Sakhalin II concession in the North to an LNG plant and oil export terminal in the South of Sakhalin island. The onshore pipeline route follows a regional fault zone and crosses individual active faults at 19 locations. Sakhalin Energy, Design and Construction companies took significant care to ensure the integrity of the pipelines, should large seismic induced ground movements occur during the Operational life of the facilities. Complex investigations including the identification of the active faults, their precise location, their particular displacement values and assessment of the fault kinematics were carried out to provide input data for unique design solutions. Lateral and reverse offset displacements of 5.5 and 4.5 m respectively were determined as the single-event values for the design level earthquake (DLE)—the 1000-year return period event. Within the constraints of a pipeline route largely fixed, the underground pipeline fault crossing design was developed to define the optimum routing which would minimize stresses and strain using linepipe materials which had been ordered prior to the completion of detailed design, and to specify requirements for pipe trenching shape, materials, drainage system, etc. Detailed Design was performed with due regard to actual topography and to avoid the possibility of the trenches freezing in winter, the implementation of specific drainage solutions and thermal protection measures.
机译:伸展800公里的双油(20寸和24寸)和天然气(20&48英寸)管道系统,以将北北部的Sakhalin II特许权联系在Sakhalin南部的北方北方植物和石油出口终端的海上碳氢化合物沉积物岛。陆上管道路线遵循区域断层区域,并在19个位置交叉各个活动故障。 Sakhalin Energy,Design and Construction Company显着注意,确保管道的完整性,应该在设施的运营生活中发生大型地震诱导地面运动。进行复杂的调查,包括识别活性故障,它们的精确位置,其特定位移值和对故障运动学的评估是为了提供独特设计解决方案的输入数据。分别为5.5和4.5米的横向和反向偏移位移作为设计水平地震(DLE)的单一事件值 - 1000年返回期事件。在管道路线的约束范围内,该地下管道故障交叉设计是开发的,以定义最佳布线,这将使用在完成详细设计之前订购的线管材料最小化应力和应变,并指定管道的要求挖沟形状,材料,排水系统等进行详细设计,以适当考虑到实际地形,避免冬季冻结的沟渠的可能性,采用特定排水解决方案的实施和热保护措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号